We are proud to have worked with the SC Department of Transportation on their US 176 Safety Project. By revamping the structure of the road between Old Monks Corner and US 52, the US Road Safety project allowed us to enhance the safety measures in place, improve the overall flow of traffic in this pocket and ultimately add back time into the Moncks Corner and Goose Creek commuter’s day. Heading into this project, Berkeley County was faced with a predicament at this specific intersection: traffic was getting bogged down, crashes were occurring more frequently, and local businesses were being impacted by the flow of traffic and the lack of safe accessibility for pedestrians. 

Through a holistic approach in coordination with the SCDOT, local government and first responders, we devised a plan to reconstruct this intersection to everyone’s benefit. The project included a multiprong approach and led to improvements across the board such as new traffic signals, enhanced pavement markings, robust and clear signage, raised medians, and updated pedestrian walkways. This combination has already made an immediate impact in overall traffic flow and reduced crash rates. Long term, the economic impact of the project anticipates pouring back into Berkeley County and its patrons, as the new intersection makes it easier and safer access local shops and businesses at this junction.

SITEWORK DONE RIGHT

Our workforce is committed to job quality and customer satisfaction from project conception to project completion. Our Core Values emphasize this commitment. We strive to create true partnerships with our customers by building trust and strengthening relationships throughout the project lifecycle. With a reputation built on putting others’ needs ahead of ourselves, our team is honest, flexible, and dependable.